New Reduced price! API 65-2 : 2010 View larger

API 65-2 : 2010

M00005829

New product

API 65-2 : 2010

ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION

American Petroleum Institute

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

1 Scope
2 Normative References
3 Definitions, and Abbreviated Terms
4 Barriers
5 Cementing Practices and Factors Affecting Cementing
  Success
6 Casing Shoe Testing
7 Post-cement Job Analysis and Evaluation
Annex A (informative) - Background and Technology
Annex B (informative) - Well Planning and Drilling Plan
        Considerations
Annex C (informative) - Drilling the Well
Annex D (normative) - Process Summary: Isolating Potential
        Flow Zones During Well Construction
Bibliography

Abstract

Provides practices for isolating potential flow zones, an integral element in maintaining well integrity. Focuses on the prevention of flow through or past barriers that are installed during well construction.

General Product Information

Document Type Standard
Status Current
Publisher American Petroleum Institute
ProductNote Reconfirmed 2010