New Reduced price! AS/NZS 3835.2:2006 View larger

AS/NZS 3835.2:2006

M00002715

New product

AS/NZS 3835.2:2006

Earth potential rise - Protection of telecommunications network users, personnel and plant Application guide

Standards Australia

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

1 -  AS/NZS 3835.2:2006 EARTH POTENTIAL RISE-PROTECTION OF TELECOMMUNICATIONS NETWORK USERS, PERSONNEL AND PLANT...
4 -  PREFACE
5 -  CONTENTS
7 -  SECTION 1 SCOPE AND GENERAL
7 -  1.1 SCOPE
7 -  1.2 APPLICATION
7 -  1.3 REFERENCED DOCUMENTS
9 -  SECTION 2 DEFINITIONS
9 -  2.1 DEFINITIONS
9 -  2.1.1 DOG
9 -  2.1.2 Earth grid voltage rise (EGVR)
10 -  SECTION 3 EPR AND GENERAL
10 -  3.1 DESCRIPTION OF EPR
11 -  3.2 SOME EPR HAZARD SITUATIONS TO CONSIDER
11 -  3.2.1 Telecommunications cables passing through a hazard zone
12 -  3.2.2 Telecommunications equipment installed inside a building which may have a hazardous EPR on its power earth
15 -  3.2.3 Voltage hazard relevant to telecommunications network
15 -  3.3 CONSIDERATION OF POWER UTILITY CONSTRUCTION PROPOSALS
16 -  SECTION 4 EPR HAZARD VOLTAGE LIMITS
16 -  4.1 INTRODUCTION
16 -  4.2 RISK OF EPR HAZARD
17 -  4.3 AUSTRALIAN EPR HAZARD VOLTAGE LIMITS
17 -  4.4 BASIS OF AUSTRALIAN EPR HAZARD VOLTAGE LIMITS
18 -  4.5 NEW ZEALAND EPR HAZARD VOLTAGE LIMITS
19 -  4.6 BASIS OF NEW ZEALAND EPR HAZARD VOLTAGE LIMITS
20 -  SECTION 5 ASSESSMENT OF EPR
20 -  5.1 EPR ASSESSMENT PROCESS
21 -  5.2 COMBINED EPR AND LFI EFFECTS
22 -  5.3 HAZARD CALCULATIONS IN SMALL INSTALLATIONS
22 -  5.3.1 General
22 -  5.3.2 EPR calculation
23 -  5.4 ELECTRODES
23 -  5.4.1 General
23 -  5.4.2 Primary electrodes
24 -  5.5 ESTIMATION OF EARTH FAULT CURRENTS
24 -  5.6 SURFACE VOLTAGE GRADIENTS
24 -  5.6.1 Earth resistivity known
25 -  5.6.2 Uncertainties in earth resistivity
26 -  5.7 LIMITS FOR APPLYING THE SIMPLIFIED CALCULATIONS
26 -  5.7.1 General
26 -  5.7.2 Non-hemispherical earthing systems
27 -  5.7.3 Multilayer earth resistivity effects
27 -  5.7.4 Conductors extending the EPR
28 -  5.8 EPR IN LARGE SUBSTATIONS
28 -  5.8.1 General
28 -  5.8.2 EPR calculation
28 -  5.9 EARTH SYSTEM IMPEDANCE
28 -  5.9.1 General
29 -  5.9.2 Aerial conductors
29 -  5.9.3 Underground cables
30 -  5.10 DETERMINATION OF PROSPECTIVE FAULT CURRENT (Initial estimate)
30 -  5.11 COMPUTER ANALYSIS
33 -  SECTION 6 FIELD TESTS AND MEASUREMENTS
33 -  6.1 INTRODUCTION
33 -  6.2 OBJECTIVES OF FIELD TESTS
33 -  6.3 METHODOLOGY
33 -  6.4 CURRENT INJECTION TESTS
33 -  6.4.1 General
34 -  6.4.2 50 Hz high-current injection test
35 -  6.4.3 Off-frequency high-current injection test
36 -  6.4.4 Off-frequency low-current injection test
39 -  6.5 SELECTION OF THE APPROPRIATE INJECTION METHOD
40 -  6.6 CURRENT SOURCES
40 -  6.6.1 Maximum value
40 -  6.6.2 50 Hz high-current source
41 -  6.6.3 Off-frequency high-current source
41 -  6.6.4 Off-frequency low-current source
42 -  6.7 REMOTE CURRENT ELECTRODE
42 -  6.7.1 Injection earth electrode
42 -  6.7.2 Potential measurement reference earth electrode
43 -  6.8 MEASURING GRID IMPEDANCE
43 -  6.8.1 Small earthing system
43 -  6.8.2 Tower or conductive pole earth resistance measurement
44 -  6.8.3 Large earthing system (fall of potential method)
45 -  6.9 MEASURING SURFACE VOLTAGE GRADIENTS
49 -  6.10 INTERFERENCE ELIMINATION
49 -  6.10.1 50 Hz standing voltage
49 -  6.10.2 Induced voltages
49 -  6.10.3 D.C. interference
50 -  6.10.4 Harmonic interferences
50 -  6.11 INTERPRETATION OF RESULTS
50 -  6.11.1 Extrapolation to remote earth
53 -  6.12 CONSIDERATION IN CONJUNCTION WITH LOW FREQUENCY INDUCTION (LFI)
54 -  6.13 SAFETY PRECAUTIONS
55 -  6.14 COORDINATION
55 -  6.14.1 Purposes of coordination
55 -  6.14.2 Coordination of tests
55 -  6.15 SOIL RESISTIVITY
55 -  6.15.1 General
57 -  6.16 METHODS OF MEASUREMENT (WENNER AND SCHLUMBERGER ARRAYS)
57 -  6.16.1 Symmetrical line arrays
58 -  6.16.2 Advantages of Wenner array
58 -  6.16.3 Advantages of Schlumberger array
59 -  6.17 RESISTIVITY MEASUREMENT ANALYSIS
59 -  6.17.1 Earth resistivity interpretation procedure
60 -  6.18 INTERPRETATION OF RESISTIVITY MEASUREMENT
61 -  6.19 SOURCES OF ERRORS
61 -  6.20 EQUIPMENT AND INSTRUMENTATION
62 -  6.21 CALIBRATION OF EQUIPMENT
63 -  SECTION 7 MITIGATION
63 -  7.1 INTRODUCTION
63 -  7.2 SCOPE OF MITIGATION
63 -  7.3 MITIGATION MEASURES APPLIED TO POWER SYSTEM PLANT
63 -  7.3.1 General
64 -  7.3.2 Design options for minimizing EPR problems
70 -  7.4 LIGHTNING PROTECTION AT TELECOMMUNICATIONS USER™s PREMISES
71 -  7.5 MITIGATION MEASURES APPLIED TO TELECOMMUNICATIONS PLANT
71 -  7.5.1 General
71 -  7.5.2 Telecommunications isolation equipment
77 -  7.5.3 Installation of isolation equipment
80 -  7.5.4 Other mitigation measures that may be applied to telecommunications plant
85 -  7.5.5 Other services entering or leaving a HV site or EPR hazard zone
85 -  7.5.6 HV and LV monitoring, metering, and control equipment using telecommunications services
86 -  APPENDIX A - TYPICAL HAZARD ZONES
86 -  A1 INTRODUCTION
86 -  A2 SCOPE
86 -  A3 TYPICAL EXTENT OF HAZARD ZONES
86 -  A3.1 For Australia
86 -  A3.2 For New Zealand
86 -  A4 GUIDELINES FOR INTERPRETATION OF THE TYPICAL HAZARD ZONE
101 -  APPENDIX B - EPR DANGER SIGNS-AUSTRALIA ONLY SIGNS FOR HV SITES AND COMMUNICATIONS CABLE PITS/MANHOLES
101 -  B1 SCOPE
101 -  B2 GENERAL
104 -  APPENDIX C - BIBLIOGRAPHY

Abstract

Specifies recommendation and code of practice for the application of the EPR Code of practice for the protection of persons or plant prescribed in AS/NZS 3835.1.

Scope

This Standard is a guide to the application of the EPR Code of practice for the protection of persons or plant prescribed in AS/NZS 3835.1. This Standard is intended for personnel responsible for ensuring safety in a telecommunications service environment.

General Product Information

Document Type Standard
Status Current
Publisher Standards Australia
Committee ET-007
Supersedes
  • DR 04472