New Reduced price! ASME PV CODE 3 NCA DIV 1&2 : 2017 View larger

ASME PV CODE 3 NCA DIV 1&2 : 2017

M00007803

New product

ASME PV CODE 3 NCA DIV 1&2 : 2017

BPVC Section III-Rules for Constructions of Nuclear Facility Components BOILER AND PRESSURE VESSEL CODE - RULES FOR THE CONSTRUCTION OF NUCLEAR FACILITY COMPONENTS - GENERAL REQUIREMENTS FOR DIVISION 1 AND DIVISION 2

American Society of Mechanical Engineers

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

List of Sections
Foreword
Statement of Policy on the Use of the Certification Mark and
 Code Authorization in Advertising
Statement of Policy on the Use of ASME Marking to Identify
 Manufactured Items
Submittal of Technical Inquiries to the Boiler and Pressure
 Vessel Standards Committees
Personnel
The American Concrete Institute
Organization of Section III
Summary of Changes
List of Changes in Record Number Order
Cross-Referencing and Stylistic Changes in the Boiler and
 Pressure Vessel Code
Article NCA-1000 - Scope of Section III
Article NCA-2000 - Classification of Components and Supports
Article NCA-3000 - Responsibilities and Duties
Article NCA-4000 - Quality Assurance Requirements
Article NCA-5000 - Authorized Inspection
Article NCA-7000 - Reference Standards
Article NCA-8000 - Certificates, Nameplates, Certification Mark,
                   and Data Reports
Article NCA-9000 - Glossary

Abstract

Provides mandatory requirements, specific prohibitions, and nonmandatory guidance for construction activities and inservice inspection and testing activities. Major Changes in the 2017 Edition - Certifying Engineer - Move Quality Assurance System Requirements to NCA-4000.

General Product Information

Document Type Standard
Status Current
Publisher American Society of Mechanical Engineers
Supersedes
  • ASME PV CODE 3 NCA DIV 1&2 : 2015