M00008176
New product
RULES FOR CONSTRUCTION OF OVERHEAD AND GANTRY CRANES (TOP RUNNING BRIDGE, MULTIPLE GIRDER)
American Society of Mechanical Engineers
In stock
Warning: Last items in stock!
Availability date: 10/27/2021
Foreword
Committee Roster
Preparation of Technical Inquiries to the Committee on
Cranes for Nuclear Facilities
Summary of Changes
Section 1000 - Introduction
Section 2000 - Quality Assurance
Section 3000 - Coatings and Finishes
Section 4000 - Requirements for Structural Components
Section 5000 - Mechanical
Section 6000 - Electrical Components
Section 7000 - Inspection and Testing
Section 8000 - Packaging, Shipping, Receiving, Storage, and
Handling
Section 9000 - Planned Engineered Lifts
Mandatory Appendix
I - Additional Requirements
II - Criteria Required for Structural Qualification of an
Existing Crane Bridge for Use With an ASME NOG-1 Type
I Hoist and Trolley
Nonmandatory Appendices
A - Recommended Practices
B - Commentary
C - NUREG-0554/ASME NOG-1 Conformance Matrix
Describes electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.
Published | |
Document Type | Standard |
Status | Current |
Publisher | American Society of Mechanical Engineers |
Pages | |
ISBN |