New Reduced price! ASME STP-NU-045-1 : 2012 View larger

ASME STP-NU-045-1 : 2012

M00008450

New product

ASME STP-NU-045-1 : 2012

Roadmap to Develop ASME Code Rules for the Construction of High Temperature Gas Cooled Reactors (HTGRS) (STP-NU-045-1 - 2012)

American Society of Mechanical Engineers

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

Foreword
1 VISION STATEMENT
2 BACKGROUND
3 STAKEHOLDERS
4 INTRODUCTION AND ORGANIZATION
5 PHASE I ACTIVITIES
6 ASSUMPTIONS USED IN DEVELOPING THE ROADMAP
   FOR PHASE II
7 REACTOR DESIGNS AND INFORMATION REQUIRED
8 RESEARCH AND DEVELOPMENT TASKS
9 RECOMMENDED "GLOBAL" ADMINISTRATIVE AND TECHNICAL TASKS
   FOR PHASES I AND II
10 RECOMMENDED SPECIFIC CODE RULE TASKS FOR PHASE II
11 OVERALL INDUSTRY APPROACH AND ORGANIZATION
ASME ST-LLC TASKS
APPENDIX 1 - LIST OF ACRONYMS AND ABBREVIATIONS
ACKNOWLEDGEMENTS

Abstract

The Roadmap has been developed as a guide to the R&D and Code development tasks that could be considered in developing rules for High Temperature Gas-Cooled Reactors (HTGR). The primary focus of the Roadmap is on the development of a complete set of rules for the design and operating conditions that are being proposed for the Next Generation Nuclear Plant (NGNP). The near-term, Part I activities focus on development of ASME III, Division 5 Code rules based on the existing ASME II, Division 1, Subsection NH rules and existing Code Cases. The Phase I activities also include incorporation of the new graphite rules in Division 5. Intermediate term activities are also covered in the Roadmap in Phase II. The intermediate term activities focus on higher temperature service and advanced design methods applicable to future HTGR designs. Very long term activities, such as the development of risk-based or system-based code rules for the HTGR are not covered in this Roadmap.

General Product Information

Document Type Standard
Status Current
Publisher American Society of Mechanical Engineers
Supersedes
  • ASME STP-NU-045 : 2010