M00050779
New product
PRACTICE FOR INSTALLATION OF UNDERGROUND CIRCULAR PRECAST CONCRETE MANHOLE STRUCTURES
American Society for Testing and Materials
In stock
Warning: Last items in stock!
Availability date: 11/06/2021
CONTAINED IN VOL. 04.05, 2016 Defines the procedures to be followed in the planning, site preparation, installation, testing and backfilling of underground vertical reinforced circular precast concrete manholes and components manufactured in accordance with Specification C 478 (C 478M) and used in sewer, drainage, and water works.
Published | |
Document Type | Standard |
Status | Current |
Publisher | American Society for Testing and Materials |
Pages | |
ISBN | |
Committee | C 13 |