New Reduced price! BS 6400-1(2016) : 2016 View larger

BS 6400-1(2016) : 2016

M00015116

New product

BS 6400-1(2016) : 2016

SPECIFICATION FOR INSTALLATION, EXCHANGE, RELOCATION, MAINTENANCE AND REMOVAL OF GAS METERS WITH A MAXIMUM CAPACITY NOT EXCEEDING 6 M[3]/H - PART 1: LOW PRESSURE (2ND FAMILY GASES)

British Standards Institution

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

Foreword<br>1 Scope <br>2 Normative references <br>3 Terms and definitions <br>4 Planning and consultation and <br>&nbsp;&nbsp;&nbsp;installation of non-return valve <br>5 Competency <br>6 Design <br>7 Gas transporter appraisal of primary <br>&nbsp;&nbsp;&nbsp;meter installations <br>8 Meter work <br>9 Gas tightness testing and purging <br>10 Commissioning of the meter installation <br>11 Notices <br>12 Meter exchange and/or replacement of other gas fittings <br>13 Meter relocation <br>14 Meter removal <br>15 Records <br>16 Post installation checks and actions <br>17 Maintenance <br>Annexes<br>Annex A (normative) - Determination of required maximum <br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;capacity of a meter or meter installation<br>Bibliography

Abstract

Defines requirements for the installation, exchange, relocation, maintenance and removal of credit or prepayment diaphragm and ultrasonic gas meters with a maximum capacity not exceeding 6 m[3]/h.

General Product Information

Document Type Standard
Status Current
Publisher British Standards Institution
Committee GSE/30
Supersedes
  • BS 6400-1(2006) : 2006
  • 14/30281818 DC : 0