M00015116
New product
SPECIFICATION FOR INSTALLATION, EXCHANGE, RELOCATION, MAINTENANCE AND REMOVAL OF GAS METERS WITH A MAXIMUM CAPACITY NOT EXCEEDING 6 M[3]/H - PART 1: LOW PRESSURE (2ND FAMILY GASES)
British Standards Institution
In stock
Warning: Last items in stock!
Availability date: 11/05/2021
Foreword<br>1 Scope <br>2 Normative references <br>3 Terms and definitions <br>4 Planning and consultation and <br> installation of non-return valve <br>5 Competency <br>6 Design <br>7 Gas transporter appraisal of primary <br> meter installations <br>8 Meter work <br>9 Gas tightness testing and purging <br>10 Commissioning of the meter installation <br>11 Notices <br>12 Meter exchange and/or replacement of other gas fittings <br>13 Meter relocation <br>14 Meter removal <br>15 Records <br>16 Post installation checks and actions <br>17 Maintenance <br>Annexes<br>Annex A (normative) - Determination of required maximum <br> capacity of a meter or meter installation<br>Bibliography
Defines requirements for the installation, exchange, relocation, maintenance and removal of credit or prepayment diaphragm and ultrasonic gas meters with a maximum capacity not exceeding 6 m[3]/h.
Published | |
Document Type | Standard |
Status | Current |
Publisher | British Standards Institution |
Pages | |
ISBN | |
Committee | GSE/30 |
Supersedes |
|