New Reduced price! TS 100 623 : 8.0.0 View larger

TS 100 623 : 8.0.0

M00042011

New product

TS 100 623 : 8.0.0

DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2+); NETWORK MANAGEMENT (NM) PROCEDURES AND MESSAGES ON THE A-BIS INTERFACE

European Telecommunications Standards Institute

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

Intellectual Property Rights
Foreword
Foreword
Introduction
1 Scope
2 References
3 Definitions and abbreviations
  3.1 Definitions
  3.2 Abbreviations
4 Functional Split between BSC and BTS
5 Information Model
  5.1 Managed Objects
  5.2 Addressing of Objects
  5.3 State Management of Objects
      5.3.1 Administrative State
      5.3.2 Operational State and Availability Status
6 Elementary Procedure
  6.1 Definition of the Procedure
  6.2 SW Download Management Procedures
       6.2.1 Load Data Initiate
       6.2.2 Load Data Segment
       6.2.3 Load Data Abort
       6.2.4 Load Data End
       6.2.5 SW Activate Request
       6.2.6 Activate SW
       6.2.7 SW Activated Report
  6.3 A-bis Interface Management Procedures
       6.3.1 Establish TEI
       6.3.2 Connect Terrestrial Signalling
       6.3.3 Disconnect Terrestrial Signalling
       6.3.4 Connect Terrestrial Traffic
       6.3.5 Disconnect Terrestrial Traffic
  6.4 Transmission Management Procedures
       6.4.1 Connect Multi-drop
       6.4.2 Disconnect Multi-drop Link
  6.5 Air Interface Management Procedures
       6.5.1 Set BTS Attributes
       6.5.2 Set Radio Carrier Attributes
       6.5.3 Set Channel Attributes
  6.6 Test Management Procedure
       6.6.1 Perform Test
       6.6.2 Test Report
       6.6.3 Send Test Report
       6.6.4 Stop Test
  6.7 State Management and Event Report Procedures
       6.7.1 State Changed Event Report
       6.7.2 Failure Event Report
       6.7.3 Stop Sending Event Reports
       6.7.4 Restart Sending Event Reports
       6.7.5 Change Administrative State
       6.7.6 Change Administrative State Request
       6.7.7 Report Outstanding Alarms
  6.8 Equipment Management Procedures
       6.8.1 Change-over
       6.8.2 Opstart
       6.8.3 Reinitialize
       6.8.4 Set Site Outputs
  6.9 Measurement Management Procedures
       6.9.1 Measurement Result Request
       6.9.2 Measurement Result Response
       6.9.3 Stop Measurement
       6.9.4 Start Measurement
  6.10 Miscellaneous Procedures
       6.10.1 Get Attributes
       6.10.2 Set Alarm Threshold
       6.10.3 Get Attributes Response
7 Structured Procedure
8 Message Details
  8.1 Message Categories
       8.1.1 Formatted O&M Messages
       8.1.2 MMI Transfer
       8.1.3 TRAU O&M Messages
       8.1.4 Manufacturer-Defined O&M messages
  8.2 Structure of Formatted O&M Messages
  8.3 SW Download Management Messages
       8.3.1 Load Data Initiate
       8.3.2 Load Data Segment
       8.3.3 Load Data Abort
       8.3.4 Load Data End
       8.3.5 SW Activate Request
       8.3.6 Activate SW
       8.3.7 SW Activated Report
  8.4 A-bis Interface Management Messages
       8.4.1 Establish TEI
       8.4.2 Connect Terrestrial Signalling
       8.4.3 Disconnect Terrestrial Signalling
       8.4.4 Connect Terrestrial Traffic
       8.4.5 Disconnect Terrestrial Traffic
  8.5 Transmission Management Messages
       8.5.1 Connect Multi-drop link
       8.5.2 Disconnect Multi-drop link
  8.6 Air Interface Management Messages
       8.6.1 Set BTS Attributes
       8.6.2 Set Radio Carrier Attributes
       8.6.3 Set Channel Attributes
  8.7 Test Management Messages
       8.7.1 Perform Test
       8.7.2 Test Report
       8.7.3 Send Test Report
       8.7.4 Stop Test
  8.8 State Management and Event Report Messages
       8.8.1 State Changed Event Report
       8.8.2 Failure Event Report
       8.8.3 Stop Sending Event Reports
       8.8.4 Restart Sending Event Reports
       8.8.5 Change Administrative State
       8.8.6 Change Administrative State Request
       8.8.7 Report Outstanding Alarms
  8.9 Equipment Management Messages
       8.9.1 Changeover
       8.9.2 Opstart
       8.9.3 Reinitialize
       8.9.4 Set Site Outputs
       8.9.5 Change HW Configuration
  8.10 Measurement Management Messages
       8.10.1 Measurement Result Request
       8.10.2 Measurement Result Response
       8.10.3 Start Measurement
       8.10.4 Stop Measurement
  8.11 Miscellaneous Messages
       8.11.1 Get Attributes
       8.11.2 Set Alarm Threshold
       8.11.3 Get Attribute Response
9 Coding
  9.1 Message Type
  9.2 Object Class
  9.3 Object Instance
  9.4 Attributes and Parameters
      9.4.1 Abis Channel
      9.4.2 Additional Info
      9.4.3 Additional Text
      9.4.4 Administrative State
      9.4.5 ARFCN List
      9.4.6 Autonomously Report
      9.4.7 Availability Status
      9.4.8 BCCH ARFCN
      9.4.9 BSIC
      9.4.10 BTS Air Timer
      9.4.11 CCCH Load Indication Period
      9.4.12 CCCH Load Threshold
      9.4.13 Channel Combination
      9.4.14 Connection Failure Criterion
      9.4.15 Destination
      9.4.16 Event Type
      9.4.17 File Data
      9.4.18 File Id
      9.4.19 File Version
      9.4.20 GSM Time
      9.4.21 HSN
      9.4.22 HW Configuration
      9.4.23 HW Description
      9.4.24 Intave Parameter
      9.4.25 Interference level Boundaries
      9.4.26 List of Required Attributes
      9.4.27 MAIO
      9.4.28 Manufacturer Dependent State
      9.4.29 Manufacturer Dependent Thresholds
      9.4.30 Manufacturer Id
      9.4.31 Max Timing Advance
      9.4.32 Measurement Result
      9.4.33 Measurement Type
      9.4.34 Multi-drop BSC Link
      9.4.35 Multi-drop next BTS Link
      9.4.36 Nack Causes
      9.4.37 Ny1
      9.4.38 Operational State
      9.4.39 Overload Period
      9.4.40 Physical Configuration
      9.4.41 Power Class
      9.4.42 Power Output Thresholds
      9.4.43 Probable Cause
      9.4.44 RACH Busy Thresholds
      9.4.45 RACH Load Averaging Slots
      9.4.46 Radio Sub Channel
      9.4.47 RF Max Power Reductions
      9.4.48 Site Inputs
      9.4.49 Site Outputs
      9.4.50 Source
      9.4.51 Specific Problems
      9.4.52 Starting Time
      9.4.53 T200
      9.4.54 TEI
      9.4.55 Test Duration
      9.4.56 Test No
      9.4.57 Test Report Info
      9.4.58 VSWR Thresholds
      9.4.59 Window Size
      9.4.60 TSC
      9.4.61 SW Configuration
      9.4.62 SW Description
      9.4.63 Perceived Severity
      9.4.64 Get Attribute Response Info
      9.4.65 Outstanding Alarm Sequence
      9.4.66 HW Conf Change Info
Annex A (informative): Change history
History

Abstract

Addresses the network management messages and procedures across the A-bis interface, which is defined as Qx in GSM.

General Product Information

Document Type Standard
Status Current
Publisher European Telecommunications Standards Institute
Committee 3GPP GERAN