M00030611
New product
LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 8: REQUIREMENTS FOR COMPONENTS FOR ISOLATED LPS
International Electrotechnical Committee
In stock
Warning: Last items in stock!
Availability date: 11/05/2021
FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Insulating stand-off
5 Insulating down-conductor
Annex A (normative) - Environmental test - corrosion
resistance
Annex B (normative) - Environmental test - resistance
to ultraviolet light
Annex C (normative) - Flow chart of tests for insulating
stand-offs
Annex D (normative) - Flow chart of tests for insulating
down-conductors
Annex E (informative) - High voltage impulse test to
determine the actual correction factor k[x] for
insulating stand-offs
Annex F (informative) - Installation arrangement test
to determine the influence of supporting structures
on the separation distance
Bibliography
Describes the requirements and tests for insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance, and the requirements and tests for insulating down-conductors, including their specific fasteners, able to reduce the separation distance.
Published | |
Document Type | Standard |
Status | Current |
Publisher | International Electrotechnical Committee |
Pages | |
ISBN | |
Committee | TC 81 |