1 Scope
2 Normative references
3 Definitions
4 General
5 Specific requirements during initial stage
of GIS project
6 Specific requirements during extension
GIS project
7 Recommended practice for GIS interface
8 Responsibility
Annex A (informative) - Standard GIS interface
for extensions anticipated from initial
stage
Annex B (informative) - GIS interface for extensions
not anticipated from initial stage
Annex C (informative) - Bibliography
Provides the recommended practices for designing and installing the interfaces between existing gas-insulated substation (GIS) equipment and new GIS equipment that is added at a later date and may be of different design and of different manufacturer.
Published | |
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |
Pages | |
ISBN | |
Supersedes |
|