M00022586
New product
RECOMMENDED PRACTICE FOR INSTALLATION, INSPECTION, AND TESTING FOR CLASS 1E POWER, INSTRUMENTATION, AND CONTROL EQUIPMENT AT NUCLEAR FACILITIES
Institute of Electrical & Electronics Engineers
In stock
Warning: Last items in stock!
Availability date: 10/29/2021
1 Overview
1.1 Scope
1.2 Purpose
1.3 Applicability
1.4 Responsibility
2 Normative references
3 Definitions
4 General considerations for initial construction,
modification, and maintenance
4.1 General
4.2 Configuration management
4.3 Planning
4.4 Closeout tracking
4.5 Procedures
4.6 Measuring and test equipment
4.7 Personnel qualification
4.8 Test data evaluation
4.9 Results
4.10 Nonconforming items
4.11 Records
5 Pre-installation constructability review
6 Installation/Construction
6.1 Equipment placement
6.2 Engineering procedures and specifications
6.3 Verification during installation
6.4 Post-installation inspections
6.5 Inspections of temporary conditions
7 Testing
7.1 General
7.2 Material source testing
7.3 Electrical tests
7.4 Physical and chemical tests
7.5 Mechanical tests
7.6 Equipment tests
7.7 System tests
7.8 Post-modification/maintenance testing plan (PMTP)
8 Supplementary provisions for multi-unit facilities
8.1 General
8.2 Planning and preparation
8.3 Work tagging considerations
8.4 Protection of existing unit(s)
8.5 Common area caution
Annex A (informative) - Bibliography
Presents considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance.
Published | |
Document Type | Standard |
Status | Current |
Publisher | Institute of Electrical & Electronics Engineers |
Pages | |
ISBN | |
Supersedes |
|