New Reduced price! IEEE 524 : 2003 View larger

IEEE 524 : 2003

M00022903

New product

IEEE 524 : 2003

THE INSTALLATION OF OVERHEAD TRANSMISSION LINE CONDUCTORS

Institute of Electrical & Electronics Engineers

More details

In stock

$35.10

-55%

$78.00

More info

Table of Contents

1. Overview
2. Normative references
3. Definitions, acronyms, and abbreviations
4. Conductor stringing methods
5. Grounding equipment and methods
6. Communications
7. Conductor reels
8. Special requirements for mobile equipment
9. Travelers
10. Typical procedures for stringing operations
11. Special conductors
Annex A (informative) - Bibliography
Annex B (informative) - Electrical theory
Annex C (informative) - Grounding electrical
        concepts
Annex D (informative) - Travelers of snub structure
        load calculation
Annex E (informative) - Basic analysis for clipping
        offsets and sagging
Annex F (informative) - Efficiency of travelers during
        tension stringing
Annex G (informative) - Recommended bearing pressure
        on sheave linings
Annex H (informative) - All aluminum 1350 alloy conductor
        standard packages
Annex I (informative) - ACSR conductor standard packages
Annex J (informative) - Drum or reel winding
Annex K (informative) - Drum or reel capacities
Annex L (normative) - Electric and magnetic field induction
        computer program presentation with sample problems
Annex M (normative) - Source code for the electric field
        induction program (EFINCUC.C)
Annex N (normative) - Source code for magnetic field
        induction program (MFINDUC.C)

Abstract

Gives general recommendations for the selection of methods, equipment, and tools that have been found to be practical for the stringing of overhead transmission line conductors and overhead groundwires.

General Product Information

Document Type Standard
Status Current
Publisher Institute of Electrical & Electronics Engineers