M00023070
New product
CRANES - MONITORING FOR CRANE DESIGN WORKING PERIOD
International Organization for Standardization
In stock
Warning: Last items in stock!
Availability date: 11/05/2021
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Recording crane operation
5 Assessment of design working period
6 Special assessment
7 General overhaul (GO)
Annex A (normative) - DWP calculation for cranes designed
to ISO 4301-1
Annex B (normative) - DWP calculation for hoisting mechanisms
designed to ISO 4301-1
Bibliography
Defines a method for monitoring, during long-term operation, the actual duty of the crane, and a means of comparing this to the original design duty which was specified through classification.
Published | |
Document Type | Standard |
Status | Current |
Publisher | International Organization for Standardization |
Pages | |
ISBN | |
Committee | TC 96 |
Supersedes |
|