M00023713
New product
PLASTICS PIPING SYSTEMS FOR RENOVATION OF UNDERGROUND NON-PRESSURE DRAINAGE AND SEWERAGE NETWORKS - PART 4: LINING WITH CURED-IN-PLACE PIPES
International Organization for Standardization
In stock
Warning: Last items in stock!
Availability date: 11/05/2021
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviated terms
5 Pipes at the 'M' stage
6 Fittings at the 'M' stage
7 Ancillary components
8 Fitness for purpose of the installed lining system at
the 'I' stage
9 Installation practice
Annex A (informative) - CIPP components and their
functions
Annex B (normative) - Cured-in-place pipes - Determination
of short-term flexural properties
Annex C (normative) - Cured-in-place pipes - Determination
of long-term flexural modulus under dry or wet
conditions
Annex D (normative) - Cured-in-place pipes - Determination
of long-term flexural strength under dry, wet or acidic
conditions (stress corrosion test)
Bibliography
Describes requirements and test methods for cured-in-place pipes and fittings used for the renovation of underground non-pressure drainage and sewerage networks with service temperatures up to 50 degrees C.
Published | |
Document Type | Standard |
Status | Current |
Publisher | International Organization for Standardization |
Pages | |
ISBN | |
Committee | TC 138 |
Supersedes |
|